Shipping used construction machinery from China to Africa is a planning job, not only a quote. Choose the method that fits the machine—container, RoRo or flat rack—then budget origin handling, ocean freight, insurance, destination port charges, customs clearance and inland transport. Core documents usually include a commercial invoice, packing list and bill of lading, plus any certificate of origin or country-specific permits your broker confirms. Freight rates move with vessel space, machine size and the discharge port, so use a current quote.
This article is for dealers and contractors shipping used excavators, loaders, bulldozers or similar machines from Shanghai to ports such as Lagos, Mombasa, Dar es Salaam or Tema. Shanghai Yongcheng Hongsheng Machinery Equipment Co., Ltd. can quote FOB or CIF and welcomes inspection before shipment. We do not publish a fixed freight price list, because rates and local charges change.
Shipping Used Machinery From China to Africa: Methods
The method should follow the machine’s size, whether it can be driven, the weather protection you want, and what your destination port can handle. A cheap booking that causes loading damage or extra port storage is not cheap.
| Method | Typical fit | What to keep in mind |
|---|---|---|
| Container (often 40 ft, sometimes high cube) | Many used mini excavators, compact machines, and some attachments or spare parts shipped with the unit | The machine must fit after any agreed disassembly. A closed box gives more weather protection, but boom or arm removal means reassembly at destination. |
| RoRo (roll-on/roll-off) | Self-propelled machines that can be driven on and off, including some wheeled equipment and running crawler machines where the service exists | RoRo can reduce lifting compared with breakbulk, but the machine must be driveable, and not every African port offers a suitable service. |
| Flat rack or open equipment | Many mid-size used excavators, used wheel loaders and used bulldozers that are too wide, too high or too heavy for a closed container | The cargo is exposed, so lashing, weather protection and cleanliness matter. Extra width or height can add charges if the unit occupies additional vessel space. |
Large or awkward units, including some cranes, may need special handling or breakbulk stowage. If you are looking at a machine such as the current used SANY 550 crane, ask for a method based on its actual dimensions and weight, not on a generic excavator quote.
What Actually Drives the Cost
Published “average” freight numbers often disagree and go out of date when vessel space, fuel surcharges or routing changes. Budget from the cost drivers below, then collect a quote for your exact unit and route.
- Dimensions and weight: width, height, length and scale weight decide whether the machine fits a container or becomes out-of-gauge cargo.
- Shipping method: container, RoRo, flat rack or breakbulk are priced differently, and surcharges differ as well.
- Route and discharge port: Shanghai to East Africa is not the same booking as Shanghai to West Africa, and congested ports add time and storage risk.
- Sailing and routing: transshipment, congestion and temporary route changes can affect transit time and price.
- Origin costs: trucking to port, export customs, lifting, packing, lashing and any boom preparation.
- Insurance: cargo insurance is included only to the extent of a CIF contract; FOB buyers usually arrange their own cover.
- Destination costs: terminal handling, documentation fees, storage if clearance is slow, duties and taxes, broker fees, and inland transport.
- Attachments and extra packages: a bucket, breaker or spare parts may need separate packing and can change the booking.
Ask the forwarder to split the quote into origin charges, ocean freight, insurance and expected destination charges, and to state what is not included, so two quotations can be compared.
Common Loading and Discharge Ports
Machines from our Shanghai yard typically leave through Shanghai-area ports and discharge at the African port that best serves your inland destination. The closest port on a map is not always the best choice if heavy-lift or RoRo capability, congestion or onward trucking is poor.
Ports buyers often discuss include Lagos-area terminals such as Apapa or Tincan, and sometimes Onne in Nigeria; Mombasa in Kenya; Dar es Salaam in Tanzania; Tema in Ghana; and other gateways such as Durban, Djibouti or Abidjan when they better serve the inland destination.
Confirm that the terminal can accept your cargo type and that the inland route can carry the machine’s weight and width. A unit that clears the port but cannot travel legally on the road has not reached your customer.
How Long the Move Usually Takes
Ocean transit from China to Africa is typically measured in weeks, not days, and the full timeline is longer than the sea voyage. Allow time for inspection, trucking to port and export clearance, waiting for a suitable sailing, discharge, customs clearance and inland delivery. West African routings are often longer than East African ones, but that is not a timetable. If a project date is fixed, build in a buffer and do not book the vessel until inspection and required pre-shipment documents are ready.
Documents You Should Align Before the Machine Sails
Agree the document pack while the commercial terms are being written. Do not wait until the unit is already at the destination terminal.
Documents common to most routes
- Commercial invoice, with a clear machine description, serial or identifying number, and value.
- Packing list, including weight and dimensions where required.
- Bill of lading, issued after shipment, with names and ports that match the commercial documents.
- Certificate of origin, when the destination customs authority or a trade preference requires it.
- Insurance details, when insurance is part of the deal (as under CIF) or when you buy a separate policy.
Names, addresses, Incoterm, port, model and serial number should be consistent across every document. Small mismatches often delay clearance.
Country notes: confirm every item with your local broker
The notes below are a starting point for discussion with a licensed customs broker and the relevant authority. They are not a clearance instruction, and rules change.
Nigeria. Commercial imports commonly go through the country’s import documentation process, often discussed in terms of Form M and later clearance documents such as the Pre-Arrival Assessment Report (PAAR). The Standards Organisation of Nigeria (SON) operates SONCAP for many regulated goods. SON’s public FAQ states that used products, other than automobiles, are exempt from the SONCAP offshore scheme, while refurbished or re-engineered commercial articles must process an Import Permit. Confirm the current SON and Nigeria Customs requirements for your exact machine before you ship.
Kenya. Formalities often include an Import Declaration Form (IDF) and single-window clearance, plus the usual invoice, packing list and bill of lading. The Kenya Bureau of Standards (KEBS) operates Pre-Export Verification of Conformity (PVoC) and has specific arrangements for used vehicles and mobile equipment from certain supply countries. China is not automatically on every public contractor list, so do not assume a certificate is, or is not, required. Ask KEBS or your Kenyan broker what currently applies to China-origin used construction machinery.
Tanzania. The Tanzania Bureau of Standards (TBS) requires a pre-shipment Certificate of Conformity for specified goods under its PVoC programme. Not every HS code is regulated. Confirm whether your machine is on the current list. If it is, do not let the cargo arrive in Dar es Salaam without the certificate.
Ghana. The Ghana Standards Authority has operated verification-of-conformity programmes, including EasyPASS, for many regulated goods. Coverage depends on the HS code and is updated from time to time. Before shipping to Tema, ask your Ghanaian broker whether a pre-shipment Certificate of Conformity is currently required.
Other African destinations have their own customs and permit rules. The method is the same: identify the tariff code, ask the destination broker for a written document list, and finish any pre-shipment certificate or licence before loading.
Think in Landed Cost, Not Only Ocean Freight
The number on a freight quotation is only one line in the landed cost. Add the machine price, origin transport and export costs, ocean freight, insurance, destination terminal and documentation charges, broker fees, duties and taxes, inspection or certificate fees, storage if clearance is slow, and inland transport. Compare FOB and CIF carefully: a CIF price already includes freight and the insurance built into that term, while an FOB price looks lower until you add the ocean leg.
How to Work With a Shanghai Exporter on Shipping
A smooth shipment usually follows this order: inspect and agree the exact machine, confirm destination documents, choose the method and port, then book space. We can support FOB shipments out of Shanghai and CIF quotations to a named port, or work with your forwarder on yard pickup. If the machine must be cleaned of soil and plant material, say so before packing, not after it is already lashed.
Frequently Asked Questions
Can a 20-ton used excavator go in a container?
Sometimes, but many 20-ton crawler excavators are too wide or too high for a standard closed container unless the configuration is prepared for that loading. Ask for the actual dimensions and a loading plan first. If the machine will not fit safely, a flat rack or RoRo booking is usually the honest option.
Is RoRo always cheaper than a flat rack?
Not always, and not on every route. RoRo depends on a suitable sailing and on the machine being able to be driven on and off. Flat rack pricing depends on size, weight and whether the cargo is out of gauge. Compare current quotes for the same machine and the same destination port.
Who pays destination port charges?
Under both FOB and CIF, destination terminal charges, clearance, duties and inland transport are commonly the buyer’s responsibility unless a quotation expressly includes them. Confirm this in writing so you are not surprised at the discharge port.
How early should I start the document process?
Start as soon as you shortlist the machine. Some certificates and import formalities must be completed before the vessel sails. Waiting until the machine is at sea can mean storage charges or, in some countries, rejection or fines.
Can you ship to my inland city, not only to the port?
The ocean booking is usually to a named port. Inland delivery can be arranged through your local agent, but road limits, permits and waiting time are local matters. Tell us the final city so the port and documents can be planned with that inland move in mind.
Get a Shipping-Ready Quotation
To estimate a shipment properly, send the machine you are considering, your destination port, and whether you want FOB Shanghai or CIF to that port. Message sales manager Leo on WhatsApp +86 150 7190 0896, email leoshanghaimachinery@gmail.com, or use the contact page. If you want to inspect the machine before it is booked to sail, we can welcome you or your inspector at our Shanghai yard.